Let's Discuss Your Project!

175 GPM RO SYSTEM WITH BLENDED MAKE UP

Customer/Site

Food Processing Facility

Turlock, California

Highlights

  • 75% recovery RO with automatic blending to reach target water quality
  • Custom designed skid
  • Custom PLC programming to include blending & Maximize flow rate

Accomplishments

  • Designed to blend to a neutral water quality to minimize fouling and corrosion potential
  • Full service project: Design, Build, and Install
  • Achieve customers target water quality with smaller footprint

 

System Specifications

  • Suez PROflex 42-3 RO System
  • 175 gpm permeate at 75% recovery/ 10% blend of feed
  • Epoxy coated steel weldment
  • 50 HP high pressure pump
  • Allen Bradley PLC control integration
  • Antiscalant dosing system
  • Sodium bi-sulfate dosing